The TV Acaemy’s Saban Media Center opens

June 2016

ARC Engineering working the the TV Academy and Gensler recently completed the Saban Media Center which has the Wolf Theater a 600 Seat state of the art theater with Dolby Atmos speaker system and Laser projection. See pictures from the star laden opening event here: has the link below embedded in it. http://photos.dailynews.com/2016/06/photos-television-academy-celebrates-70th-anniversary-by-opening-saban-media-center-at-all-star-celebrity-gala/#1


Fullscreen featured in Interior Design Magazine

June 2016

ARC Engineerings Fullscreen project featured in interior design magazine, read more here: http://www.interiordesign.net/projects/11928-fullscreen-s-los-angeles-headquarters-by-rapt-studio-signals-a-bright-future-for-content-creators/


Element LA earns LEED GOLD!

May 2016

Congratulations to Element LA: 12333 Olympic!  The LEED project has just received a Gold certification by the USGBC under the LEED v2009 Core and Shell rating system. A final LEED scorecard is attached for your records noting a final score of 60 points.


Oracle Santa Monica opens for business

May 2016

ARC Completes the Oracle Santa Monica project with a very happy client.


Calibre Award nominations are out

March 2016

Caliber awards are around the corner and the SoCal Chapter of IIDA has announced the nominations. Once again ARC is honored to be on 11 nominated teams.


Museum of Neon Art is open for viewing

February 2016

The Museuem of Neon Art was completed and is open to dazzle with light. ARC completed the project with Shimoda Design Group – see more at neonmona.org


The Collective wins Gold – LABJ Real Estate Awards

February 2016

ARC Engineering was part of the team winningGold for Best office project at the Los Angeles Business Journal’s Commerical Real Estate Awards – 2016 joining Tishman Speyer, Shimoda Design Group and Turner Construction. More on the Collective: http://www.tishmanspeyer.com/properties/collective-playa-vista  


Respawn moves in to Valley Office

February 2016

ARC Engineering completes the Respawn project in the San Fernando Valley – The video gaming company with development titles, Call of Duty and Infinity ward, moved into their new ofice space featuring under floor air, gym, UPS, inrow coling, UPS and Generator back-up. See more here: http://www.respawn.com/tour-our-new-offices  


More Accolades for Wallis Annenberg

July 2014

The Wallis Annenberg Center for the Performing Arts has been awarded again and is recipient of this year’s “Annual Preservation Design Award” ! m.architectmagazine.com


LEED® Silver for Deckers

June 2014

The new global headquarters for Deckers, the company that makes Uggs, Tevas, Sanuk and other footwear, has earned the company a LEED® Silver Certification. Deckers Outdoor Corp. built a 190,000-square-foot ground up complex of four buildings in Goleta, California, outside Santa Barbara. The headquarters made of recycled building materials has parking spaces reserved for energy-efficient […]